ANEEL concludes another bidding for transmission lines

power transmission & Sunset

The second phase of the bidding for transmission lines nº 13/2015 has been  successfully completed by the National Agency for Electric Energy – ANEEL. The bidding has negotiated 21 lots located in the following states: Bahia, Ceará, Goiás, Espírito Santo, Minas Gerais, Pará, Paraíba, Piauí e Rio Grande do Norte.

The bidding, held last friday (10/28) at BM&FBOVESPA in São Paulo, has provided the hiring of construction of 6126 km of transmission lines and 6 thousand mega-volt-amperes (MVA) of substations power.

As a positive result from the bidding, there shall be investments of over R$ 11,6 billion in transmission.

In this opportunity, Sion Advogados, with satisfaction and optimism regarding the results, congratulates its clients that achieved success in the  bidding, what should contribute to the development of the energy segment in the country. The firm counts with a highly specialized and experienced team in the segment, and remains at disposal for any clarifications and support.

Source: http://www.aneel.gov.br/sala-de-imprensa-exibicao/-/asset_publisher/XGPXSqdMFHrE/content/aneel-conclui-com-sucesso-leilao-de-mais-de-6-mil-km-de-linhas-de-transmissao/656877?inheritRedirect=false

21

Share on facebook
Share on twitter
Share on linkedin
Share on print
Share on email
Close Menu